Electric Power Guarantee Service for the Opening Ceremonyof the 14th National Winter Games (2020)

Case Study: Reliable Power Supply in Extreme Cold – First Project at -35°C

Project Background
Shanghai Yude Energy Co., Ltd. successfully delivered its first power supply project under extreme outdoor temperatures of -35°C, showcasing the company’s exceptional engineering capabilities and resilience in harsh environments.

Key Equipment Deployed

  • Generators
    • Brand: Cummins
      Power Range: 1000KVA–1500KVA
      Quantity: 8 sets
    • Brand: Japan DENYO
      Power Range: 600KVA–800KVA
      Quantity: 4 sets
  • Transformers
    • Brand: Schneider
      Power: 1000KVA–2000KVA
      Quantity: 6 sets
    • Note: No transformers in the 400KVA–800KVA range were used due to on-site design requirements.
  • Distribution Cabinets
    • Main Component Brand: Schneider
    • Specifications: 250A–2500A
    • Quantity: 80 sets
  • Cables
    • Brand: Prysmian
    • Specification: 70–240 mm²
    • Total Length: 60,000 meters
  • UPS System
    • Brand: Eaton
    • Total Capacity: 5000KVA
    • Quantity: 20 sets

Construction Period: 90 days

Project Highlights
Despite extreme temperatures, Yude Energy completed equipment delivery, installation, and commissioning on schedule. The project provided a stable, safe, and uninterrupted power supply, fulfilling the client’s operational demands in a challenging environment.

This milestone reflects Yude Energy’s capability to deliver rapid-response, high-standard power solutions even under the most demanding conditions.