Olympic Qualifier Series in Shanghai(16,May,2024-19,May 2024)

Construction Period:

  • 90 Days

Equipment Invested by the Company:

  1. Generators
    • Cummins: 12 units, each with a power rating of 1250KVA, providing reliable energy output to meet demanding needs.
    • Japan DENYO: 6 units, with power ranging from 600KVA to 800KVA, supporting versatile energy requirements.
  2. Distribution Cabinets
    • Equipped with 180 sets of cabinets featuring Schneider main components, rated for 250A-2500A, ensuring safe, efficient power distribution throughout the site.
  3. Cables
    • Installed 92,000 meters of high-quality Prysmian cables (specifications 70-240 square mm), facilitating stable and efficient power transmission.
  4. Uninterruptible Power Supply (UPS)
    • Provided 32 sets of UPS systems by Eaton/ABB Ourdoor, with a total capacity of 2600KVA, to safeguard critical power continuity and system stability.

Project Highlights:

  • Reliable Generators and Power Cabinets: Utilization of trusted brands like Cummins and Schneider guaranteed consistent power delivery and system safety.
  • Extensive Cabling Network: Large-scale cable deployment ensured robust power transmission with minimal loss, boosting overall system efficiency.
  • Ample Backup Power: UPS systems provided critical uninterrupted power supply to key systems, preventing downtime and protecting sensitive equipment.
  • Efficient Execution: The entire power system was installed and commissioned within a tight 90-day schedule, demonstrating our project management excellence.

Solve your power generation challenges