Electric Power Guarantee Service in Zhangjiakou CompetitionArea of the 24th Winter Olympic Games (2022)

Project Duration:

  • 180 Days

Equipment Supplied and Specifications:

  1. Generators
    For this high-profile event, we supplied reliable generators to meet critical power needs:
    • Cummins Generators: 6 units ranging in power from 1000KVA to 1500KVA.
    • Japan DENYO Generators: 2 units with capacities between 600KVA and 800KVA.
  2. Transformers
    No transformers were utilized for this event phase, as power needs were met through other infrastructure.
  3. Distribution Cabinets
    Similarly, no distribution cabinets were installed during this project phase.
  4. Cabling
    No cabling was deployed for this event component.
  5. Uninterruptible Power Supply (UPS)
    Critical power backup was ensured using:
    • Eaton UPS systems: 256 units with a combined capacity of 16,000KVA, providing robust power stability and uninterrupted supply for sensitive operations throughout the event.

Project Highlights and Impact:

  • Precision and Reliability: The choice of world-renowned products such as Cummins and Eaton enabled us to deliver dependable energy suited for the event’s stringent requirements.
  • UPS Focus: With no transformers, distribution cabinets, or cabling involved in this phase, the focus centered on providing uninterruptible power supply, critical for safeguarding sensitive equipment and maintaining flawless event operations.
  • Scale and Expertise: Managing 256 UPS units with extensive capacity underscores our ability to scale solutions for large and complex projects efficiently.
  • Commitment to Excellence: Over a 180-day period, our team ensured seamless setup, maintenance, and performance, integral to the event’s success.

Solve your power generation challenges

Related Products