Olympic Qualifier Series in Shanghai(16,May,2024-19,May 2024)
Construction Period:
90 Days
Equipment Invested by the Company:
Generators
Cummins: 12 units, each with a power rating of 1250KVA, providing reliable energy output to meet demanding needs.
Japan DENYO: 6 units, with power ranging from 600KVA to 800KVA, supporting versatile energy requirements.
Distribution Cabinets
Equipped with 180 sets of cabinets featuring Schneider main components, rated for 250A-2500A, ensuring safe, efficient power distribution throughout the site.
Cables
Installed 92,000 meters of high-quality Prysmian cables (specifications 70-240 square mm), facilitating stable and efficient power transmission.
Uninterruptible Power Supply (UPS)
Provided 32 sets of UPS systems by Eaton/ABB Ourdoor, with a total capacity of 2600KVA, to safeguard critical power continuity and system stability.
Project Highlights:
Reliable Generators and Power Cabinets: Utilization of trusted brands like Cummins and Schneider guaranteed consistent power delivery and system safety.
Extensive Cabling Network: Large-scale cable deployment ensured robust power transmission with minimal loss, boosting overall system efficiency.
Ample Backup Power: UPS systems provided critical uninterrupted power supply to key systems, preventing downtime and protecting sensitive equipment.
Efficient Execution: The entire power system was installed and commissioned within a tight 90-day schedule, demonstrating our project management excellence.