Electric Power Guarantee Service for the Opening Ceremonyof the 14th National Winter Games (2020)
Case Study: Reliable Power Supply in Extreme Cold – First Project at -35°C
Project Background Shanghai Yude Energy Co., Ltd. successfully delivered its first power supply project under extreme outdoor temperatures of -35°C, showcasing the company’s exceptional engineering capabilities and resilience in harsh environments.
Key Equipment Deployed
Generators
Brand: Cummins Power Range: 1000KVA–1500KVA Quantity: 8 sets
Brand: Japan DENYO Power Range: 600KVA–800KVA Quantity: 4 sets
Note: No transformers in the 400KVA–800KVA range were used due to on-site design requirements.
Distribution Cabinets
Main Component Brand: Schneider
Specifications: 250A–2500A
Quantity: 80 sets
Cables
Brand: Prysmian
Specification: 70–240 mm²
Total Length: 60,000 meters
UPS System
Brand: Eaton
Total Capacity: 5000KVA
Quantity: 20 sets
Construction Period: 90 days
Project Highlights Despite extreme temperatures, Yude Energy completed equipment delivery, installation, and commissioning on schedule. The project provided a stable, safe, and uninterrupted power supply, fulfilling the client’s operational demands in a challenging environment.
This milestone reflects Yude Energy’s capability to deliver rapid-response, high-standard power solutions even under the most demanding conditions.